CONSTRUCTION DETAILS

CONSTRUCTION DETAILS

CONSTRUCTION DETAILS

CONSTRUCTION DETAILS

Part 2-Earthwork
SECTION 201-CLEARING AND GRUBBING

201.01-Description
201.02-Equipment
201.03-Clearing and Grubbing
201.04-Disposal of Debris
201.05-Method of Measurement
201.06-Basis of Payment

SECTION 202-REMOVAL OF STRUCTURES AND OBSTRUCTIONS

202.01-Description
202.02-Equipment
202.03-General
202.04-Removal of Bridges, Culverts, & Other Drainage Structures
202.05-Removal of Pipe
202.06-Removal of Pavement, Sidewalks, Curbs, Etc. Constructed of Portland Cement Concrete
202.07-Removal of Underground Storage Tanks
202.08-Water Well Abandonment
202.09-Method of Measurement
202.10-Basis of Payment

CONSTRUCTION DETAILS
SECTION 203-EXCAVATION AND UNDERCUTTING

203.01-Description
203.02-Classification
203.03-Equipment
203.04-General
203.05-Undercutting
203.06-Stripping, Stockpiling and Placing Topsoil
203.07-Disposal of Excess or Unsuitable Material
203.08-Sloping, Shaping and Dressing
203.09-Method of Measurement
203.10-Basis of Payment

CONSTRUCTION DETAILS
SECTION 204-STRUCTURE EXCAVATION FOUNDATION PREPARATION, AND BACKFILL

204.01-Description
204.02-Classification
204.03-Foundation Fill Material
204.04-Bedding Material
204.05-Concrete
204.06-Backfill Material
204.07-Equipment
204.08-Excavation
204.09-Protection of Excavation
204.10-Foundation Preparation
204.11-Backfilling
204.12-Method of Measurement
204.13-Basis of Payment

CONSTRUCTION DETAILS
SECTION 205-EMBANKMENTS

205.01-Description
205.02-Equipment
205.03-Preparation of Embankment Areas
205.04-Formation of Embankments
205.05-Stability of Embankments and Cut Slopes
205.06-Disposal of Excess or Unsuitable Material
205.07-Method of Measurement
205.08-Basis of Payment

CONSTRUCTION DETAILS
SECTION 206-FINAL DRESSING

206.01-Description
206.02-Equipment
206.03-Method and Scope of Work

SECTION 207-SUBGRADE CONSTRUCTION AND PREPARATION

207.01-Description
207.02-Equipment
207.03-Preparing Subgrade
207.04-Compacting Subgrade
207.05-Drainage and Protection
207.06-Checking Subgrade
207.07-Disposal of Excess or Unsuitable Material
207.08-Method of Measurement
207.09-Basis of Payment

CONSTRUCTION DETAILS
SECTION 208-SHOULDERS AND DITCHES

208.01-Description
208.02-Materials
208.03-Equipment
208.04-General
208.05-Final Cleanup
208.06-Method of Measurement
208.07-Basis of Payment

SECTION 209-PROJECT EROSION AND SILTATION CONTROL

209.01-Description
209.02-Classification
209.03-Equipment
209.04-Project Review
209.05-Preconstruction Conference
209.06-Construction Requirements
209.07-Construction of Structures
209.08-Method of Measurement
209.09-Basis of Payment

Download Construction Details


Leave a Reply

Your email address will not be published. Required fields are marked *

*