Article No.27  Different terms related to topography of oceanic planes By Engr. Khawaja Ali Bank A raised area of land along the side of a river Basin A large area of land whose surface water all flows into a particular river or lake Bay An area of the coast where the land curves inwards Beach An area of sand or small stones beside the sea or a lake Bight A long curved part of the coast or a large river Bund A raised Continue reading Topography of oceanic planes→

Layout of Buildings

Article No. 26 “Layout of Buildings” LAYOUT Layout of a building or a structure shows the plan of its foundation on the ground surface according to its drawings, so that excavation can be carried out exactly where required and position Continue reading Layout of Buildings→

Work Breakdown Structure Examples

Work Breakdown Structure Examples Work breakdown structure Examples. What is a work breakdown structure ? Read about WBS here. Example # 1 Example # 2 The Project Management Body of Knowledge (PMBOK) defines the work breakdown structure as a “deliverable oriented hierarchical Continue reading Work Breakdown Structure Examples→

What is A Work Breakdown Structure

What is A Work Breakdown Structure (WBS) The Project Management Body of Knowledge (PMBOK) defines the work breakdown structure as a “deliverable oriented hierarchical decomposition of the work to be executed by the project team.” Division of the main work Continue reading What is A Work Breakdown Structure→