CONSTRUCTION INSPECTION

CONSTRUCTION INSPECTION EXCAVATION AND EMBANKMENTS EXCAVATION AND EMBANKMENTS EXCAVATION:CONSTRUCTION INSPECTION Under Section 203 of the 1995 Specifications, details of earthwork operations are described. These operations basically involve 3 operations: topsoil removal, cut and fill. Topsoil is removed from areas shown on Continue reading CONSTRUCTION INSPECTION

CONSTRUCTION DETAILS

CONSTRUCTION DETAILS CONSTRUCTION DETAILS Part 2-Earthwork SECTION 201-CLEARING AND GRUBBING 201.01-Description 201.02-Equipment 201.03-Clearing and Grubbing 201.04-Disposal of Debris 201.05-Method of Measurement 201.06-Basis of Payment SECTION 202-REMOVAL OF STRUCTURES AND OBSTRUCTIONS 202.01-Description 202.02-Equipment 202.03-General 202.04-Removal of Bridges, Culverts, & Other Drainage Structures Continue reading CONSTRUCTION DETAILS

Box Culvert Design

Box Culvert Design HIGHWAY DESIGN MANUAL Chapter 19: REINFORCED CONCRETE BOX CULVERTS AND SIMILAR STRUCTURES Contents of Box Culvert Design INTRODUCTION. SELECTION CRITERIA PROJECT DEVELOPMENT PROCEDURES FOR BRIDGE SIZE CULVERTS FOUNDATIONS DESIGN GUIDELINES FOR BOX CULVERTS COMPUTER DESIGN AND ANALYSIS PROGRAM Continue reading Box Culvert Design

SAMPLING AND CONTROL OF ASPHALT CONCRETE

SAMPLING AND CONTROL OF ASPHALT CONCRETE Sampling and Control of Asphalt Concrete (52 Pages) By Virginia Department of Transportation Contents SECTION 501 GENERAL ………………………………………………………………………………………………………….2 Sec. 501.01 General Responsibility of Materials Division ……………………………………………………………3 Sec. 501.02 Duties of the Project Inspector ………………………………………………………………………………..4 SECTION Continue reading SAMPLING AND CONTROL OF ASPHALT CONCRETE